<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/css" href="/stylesheets/rss.css"?>
<rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:trackback="http://madskills.com/public/xml/rss/module/trackback/">
  <channel>
    <title>Passion Trail Bikes, Belmont, CA - specialists in quality bike service and custom-built mountain bikes: Waterdog Lake Loop Trail volunteer builders needed!</title>
    <link>http://passiontrailbikes.com/articles/2009/03/27/waterdog-lake-loop-trail-volunteer-builders-needed</link>
    <language>en-us</language>
    <ttl>40</ttl>
    <description>For the Love of Mountain Biking</description>
    <item>
      <title>Waterdog Lake Loop Trail volunteer builders needed!</title>
      <description>&lt;p&gt;In the last month we have finally navigated all the bureaucratic paperwork, designs, reports, &lt;span class="caps"&gt;CEQA&lt;/span&gt; statements, City Council approvals etc. and have started construction on the new Lake Loop Trail in Waterdog Park. This is actually a trail realignment project; there is currently a trail that goes around the lake (shown in red), however it was built below the high water mark and it has become impassible in spots, even for hiking. It was never intended to be a multi-use trail and while it wasn&amp;#8217;t illegal for bikes it wasn&amp;#8217;t rideable either.
&lt;img src="http://farm4.static.flickr.com/3430/3363797209_46966a3f37_o.jpg"&gt;&lt;/p&gt;


	&lt;p&gt;The new trail (shown in white) is intended to be an &lt;span class="caps"&gt;EASY&lt;/span&gt; trail, suitable for family outings &amp;#8211; beginner riders, kids, strollers, etc. It will be wider than most of the singletrack that already exists in Waterdog, built to a 4&amp;#8217; to 5&amp;#8217; width and at a mild grade of less than 10% with no sustained climbs &amp;#8211; it will be mostly flat. There will be three bridges over streams that feed the lake and a bridge over the spillway that will bypass the pavers. Volunteers will build both the trail, &lt;span class="caps"&gt;AND&lt;/span&gt; the bridges, as well as some really cool retaining walls.&lt;/p&gt;


	&lt;p&gt;My hope is to get this project completed by the end of September. I would really like to get the trail tread cut in before the end of May, and to build the bridges in the summer. So I&amp;#8217;m looking to recruit some extra volunteers for the next two months to make some progress on the bench cutting.&lt;/p&gt;


	&lt;p&gt;If you can make any of the dates I have posted on our community calendar please let me know. Email me at &lt;a href="mailto:patty@passiontrailbikes.com?subject=Waterdog Trailwork volunteering"&gt;patty@passiontrailbikes.com&lt;/a&gt;&lt;P&gt;&lt;/p&gt;


	&lt;p&gt;The work projects are four hours long, and start at the times listed (subject to change):&lt;BR&gt;
Saturday 3/28 8:30am&lt;BR&gt;
Saturday 4/4 9:00am&lt;BR&gt;
Thursday 4/9 8:30am&lt;BR&gt;
Sunday 4/12 8:30am&lt;BR&gt;
Wednesday 4/22 5:30pm (Earth day)&lt;BR&gt;
Sunday 5/3 8:00am&lt;BR&gt;
Sunday 5/10 8:30am&lt;BR&gt;
Monday 5/18 2:00pm&lt;BR&gt;
Saturday 5/23 9:30am (Memorial day weekend)&lt;BR&gt;
Saturday 6/6 9:00am&lt;BR&gt;&lt;/p&gt;


	&lt;p&gt;&lt;img src="http://farm3.static.flickr.com/2004/2381617026_dc1c268711.jpg"&gt;&lt;br&gt;
&lt;i&gt;Alex, Valerie and Krishna cutting in new trail tread at Waterdog Lake&lt;/i&gt;&lt;P&gt;&lt;/p&gt;</description>
      <pubDate>Fri, 27 Mar 2009 20:45:00 +0000</pubDate>
      <guid isPermaLink="false">urn:uuid:f9155ec7-d8f6-48d8-a43f-5483aa55ee6f</guid>
      <author>Patty</author>
      <link>http://passiontrailbikes.com/articles/2009/03/27/waterdog-lake-loop-trail-volunteer-builders-needed</link>
      <category>Trails</category>
      <enclosure type="application/msword" url="http://passiontrailbikes.com/files/Belmont_VOLUNTEER_PERMISSION_SLIP.doc" length="52736"/>
    </item>
    <item>
      <title>"Waterdog Lake Loop Trail volunteer builders needed!" by Patty</title>
      <description>&lt;p&gt;For earth day, meet on the dam at 5:30 and we work until sunset.&lt;/p&gt;</description>
      <pubDate>Wed, 22 Apr 2009 20:16:46 +0000</pubDate>
      <guid isPermaLink="false">urn:uuid:ea37e6f7-ad3d-40a3-9a9e-6532dfd8b706</guid>
      <link>http://passiontrailbikes.com/articles/2009/03/27/waterdog-lake-loop-trail-volunteer-builders-needed#comment-609</link>
    </item>
  </channel>
</rss>
